Access Construction Equipment provides a unique solution for this Florida beach restoration. MiniveyorUSA moved 1500 tons of sand 150 feet to beach front to repair erosion issues. The job was completed in 4.5 days using minimal manpower as compared to the estimated three week minimum using conventional methods and far more workers to preform the backbreaking job. When the job was done, MiniveyorUSA was picked up and removed from the site leaving no footprint to repair.
Video: See the Miniveyor in Use on Beach Restoration Project
MiniveyorUSA moved 1,500 tons of sand 150 ft. to a beach front to repair erosion issues.
Apr 7, 2017
Latest in ForConstructionPros Video Library
Built for the Road
March 27, 2025
Solutions for Every Size Patching Job
March 26, 2025
A New Generation of Roller Couplings From Regal Rexnord
March 26, 2025




![[VIDEO] Caterpillar Shows How Virtually Reality Can Improve Field Diagnostics](https://p1-cms-assets.imgix.net/files/base/acbm/fcp/image/2016/06/default.5764340cc06b3.png?auto=format%2Ccompress&fit=crop&h=167&q=70&w=250)
![[VIDEO] Construction News: Labor and Materials Costs Rise with Construction Demand](https://p1-cms-assets.imgix.net/files/base/acbm/fcp/image/2017/03/default.58dab2a10b02e.png?auto=format%2Ccompress&fit=crop&h=167&q=70&w=250)







![Hj1y06a9 720[1]](https://p1-cms-assets.imgix.net/files/base/acbm/fcp/image/2025/01/hj1y06a9_720_1_.67979fbd9d2cf.png?ar=16%3A9&auto=format%2Ccompress&fit=crop&h=135&q=70&rect=21%2C0%2C677%2C380&w=240)




