Gallagher Asphalt installed the MAXAM Transporter on their asphalt plant in Thronton, Il. The Perma Store system moves the proper mix into the designated silo with one moving batcher and segregation is all but eliminated due to the removal of drag conveyors.
Demonstration of the MAXAM Perma Stor Hotmix Asphalt Storage System at Gallagher Asphalt
May 12, 2016
Latest in Infrastructure
The Sanibel Causeway Reconstruction: Three Years After Hurricane Ian
September 15, 2025
Take The Asphalt Contractor Industry Survey 2025
August 3, 2025



















